(404) Page not found
Unfortunately, the page or file you were looking for cannot be found. This usually happens because an opportunity or event listing has expired, or a publication has been removed. You may visit the following pages for additional information:
- Career and Volunteer Opportunities
- Get Involved in Standardization
- Event announcements
- Publications
- Site map
You may also use following search box to find what you were looking for. Verify your keyword(s) and click "Search":
Search results
Showing items 1 through 10 of 25.
-
Mobilizing the Recommendations in Thermally Comfortable Playgrounds
language to get into the planning process (routes, nodes, corridors) to make sure that trees don’t get
Stacey Scott - 2021/11/17 - 15:17
-
The Canadian Smart Grid Standards Roadmap
The goal of this document is to provide a roadmap—a strategic plan—to advance the standards environment from today’s legacy electricity grid to tomorrow’s full deployment, operation and evolution of the Canadian Smart Grid. The new standards environment wi
Anonymous (not verified) - 2016/07/14 - 11:40
-
Canadian Data Governance Standardization Roadmap
The Canadian Data Governance Standardization Roadmap tackles the challenging questions we face when we talk about standardization and data governance. It describes the current and desired Canadian standardization landscape and makes 35 recommendations to a
Stacey Scott - 2023/10/31 - 13:29
-
Information technology- MPEG systems technologies- Part 2: Fragment request units
peer. It can also be used for node-by-node navigation of a remote XML document To review the Standard
debbie.bible - 2018/08/16 - 07:03
-
Information Technology- Fibre Distributed Data Interface (FDDI)- Part 21: Abstract Test Suite for FDDI Physical Layer Protocol Conformance Testing (PHY ATS)
a conformance test of the PHY functions in a path through an FDDI node. Figure 1 is a functional block diagram through an FDDI node. The PHY Repeat Filter is optional when there is a MAC in the repeat path.
debbie.bible - 2019/03/19 - 17:24
-
Information technology- MPEG systems technologies- Part 2: Fragment request units
peer. It can also be used for node-by-node navigation of a remote XML document. To review the Standard
Mary Morgan - 2023/08/16 - 22:20
-
Information technology — MPEG video technologies — Part 2: Fixed-point 8×8 inverse discrete cosine transform and discrete cosine transform
peer. It can also be used for node-by-node navigation of a remote XML document. To review the Standard
Mary Morgan - 2023/08/16 - 22:23
-
Information Technology- Fibre Distributed Data Interface (FDDI)- Part 21: Abstract Test Suite for FDDI Physical Layer Protocol Conformance Testing (PHY ATS)
a conformance test of the PHY functions in a path through an FDDI node. Figure 1 is a functional block diagram through an FDDI node. The PHY Repeat Filter is optional when there is a MAC in the repeat path.
Mary Morgan - 2024/02/27 - 09:52
-
Information technology-- W3C Web Services Addressing 1.0-- Core
that include processing nodes such as endpoint managers, firewalls, and gateways in a transport-neutral manner
debbie.bible - 2017/05/11 - 16:19
-
Information technology-- Telecommunications and information exchange between systems-- Local and metropolitan area networks-- Specific requirements-- Part 1AX: Link aggregation
to three nodes in a network and one to three nodes in another, separately administered, network, along
debbie.bible - 2016/06/01 - 16:12