Search
Drupal Primary tabs
Search results
Showing items 1 through 10 of 26.
-
Characterization of fill materials
clients, financial institutions, etc. The stakeholders want to make the requirements regarding processes
Carole Tremblay - 2023/07/06 - 06:24
-
Construction Work — Drinking Water and Sewer Lines — General Technical Specifications
manholes, catch basins, valves, fire hydrants, valve chambers, drinking water service lines, and sewer service lines. all required connections, including connections to existing lines. all appurtenances drinking water supply system for service lines affected by work, as well as the requirements related
eveline.giles - 2019/12/05 - 06:06
-
Construction Work- Drinking Water and Sewer Lines- General Technical Specifications
basins, valves, fire hydrants, valve chambers, drinking water service lines, and sewer service lines. all system for service lines affected by work, as well as the requirements related to maintaining fire
Carole Tremblay - 2020/12/02 - 16:26
-
Construction Work- Drinking Water and Sewer Lines- General Technical Specifications
fire hydrants, valve chambers, drinking water service lines, and sewer service lines. all required for service lines affected by work, as well as the requirements related to maintaining fire protection when
Carole Tremblay - 2022/03/15 - 16:45
-
Construction Work- General Technical Specifications- Drinking Water and Sewer Lines
service laterals and sewer service laterals; d) all required connections, including connections wall; h) the installation of a temporary drinking water supply system for service lines affected these particular structures, notably because not all materials have the same service life under different
eveline.giles - 2015/09/29 - 15:32
-
Construction Work- General Technical Specifications- Drinking Water and Sewer Lines
service laterals and sewer service laterals; d) all required connections, including connections wall; h) the installation of a temporary drinking water supply system for service lines affected these particular structures, notably because not all materials have the same service life under different
eveline.giles - 2015/09/29 - 15:32
-
Construction Work- Rock Blasting- Preventing Carbon Monoxide Poisoning
children, people with heart conditions). Users of this specification should take this into account. 3
Carole Tremblay - 2022/10/05 - 16:59
-
Existing Sanitary Sewer Systems- Inflow and Infiltration Mitigation Program- Guidelines
the identification of the sources and evaluation of I/I flows, the determination of appropriate levels of service and regulatory authorities in charge of the sanitary sewer systems, engineers and planning services. These groups
Carole Tremblay - 2023/05/31 - 20:50
-
Geotechnical Site Investigations for Building Foundations in Permafrost
at collecting information and evaluating the conditions of the site for the purpose of designing
eveline.giles - 2015/09/29 - 15:32
-
Geotechnical Site Investigations for Building Foundations in Permafrost Zones
management framework, of the conditions prevailing at the building site, including: the distinctive characteristics of permafrost; the seasonal and interannual climate conditions as well as the projected climate conditions over the service life of the building foundations; the other conditions that may have an impact
Carole Tremblay - 2023/02/28 - 20:45